The manufacturer of the Ariane rockets is preparing to cut 600 jobs in France and Germany by the end of 2022 to regain competitiveness, particularly in the face of competition from the American SpaceX, we learned from management and unions.
“We have indeed announced a plan to adapt the workforce of a maximum of 600 people which concerns France and Germany,” the company’s director of human resources, Florence Gallois, told AFP.
No site closure is planned, but “all the departments and sites” of the company, whether in Germany or France, are concerned, she added.
“All workstations are affected, except workshop staff,” said a union source. The planned job cuts affect indeed “functions related to the structure of the company”, such as project management or support functions, according to Ms. Gallois.
“Knowing that in France there are 350 natural departures each year, if we add the flow of hires that the company will maintain, it will be necessary to leave 150 to 200 people”, estimated Philippe Gery, central union delegate CFE- CGC.
Unveiled by the weekly Challenges, this plan aims to restore competitiveness and reduce the costs of the manufacturer of Ariane rockets in the face of fierce competition from the American SpaceX and its reusable launchers.
A joint venture between Safran and Airbus, ArianeGroup is developing the Ariane 6 heavy launcher, the inaugural launch of which has been postponed to the second quarter of 2022 due to technical difficulties aggravated by the consequences of the health crisis.
Management says it is working with the two shareholder groups to study solutions for redeploying employees to Safran and Airbus. “We are not talking about a social plan,” said Florence Gallois.
Ariane 6’s launch prospects relate to a need for seven shots per year, 30% less than when the 2014 project was launched, forcing the company to reduce its costs.
– Economic viability of Ariane 6 –
A Franco-German agreement concluded in July provides for the European Space Agency (ESA), of which the two countries are the main contributors, to provide additional funding of 140 million euros per year to ensure the economic viability of Ariane 6.
The Franco-German agreement also includes the transfer of production of Vinci, the re-ignitable engine for the upper stage of the launcher, from Vernon (Eure) to the Arianegroup site in Ottobrunn, Germany.
This transfer represents “40,000 hours of annual work,” says Mr. Gery, or about 40 jobs in Vernon, according to management.
“The worm was in the fruit, but it is a hard blow”, admitted the union official, for whom “it will weaken the French control over projection technology”.
The transfer will take many months and is not part of the job cuts plan that must be in place by the end of 2022, insisted Florence Gallois.
But Philippe Gery says he fears that he will call others. Like that of the Prometheus engine, spearheading the European strategy to stay in the space race in the face of international competition. Less expensive, versatile and reusable, this future engine, 70% manufactured in 3D printing, is being developed in Vernon.
The transfer of Vinci “could sign the end of the Vernon plant in the longer term,” said Philippe Gery. The latter employed 952 permanent contracts at the end of December 2020.
“Nothing leads us to believe that the plan of 2,500 fewer staff by 2025 is no longer relevant,” reacted Benoit Dalgalarrondo, CGT union representative, even if the management refuses to look beyond 2022. “For us, this plan is not justified,” he added.
ArianeGroup employs 7,600 people and achieved a turnover of 2.5 billion in 2020.
The Ariane 6 launch pad under construction on March 5, 2020 in Kourou, Guyana
– jody amiet (AFP / Archives)
Download HoneyWorks – Sukisugiteyabai – Kokuhakujikkouiinkai Character Song Shu Album Mp3 Zip
Download 5th And Pontiac – My Pet Goat – EP Album Mp3 Zip
Download Evertide – Reflect Album Mp3 Zip
Download The Jo-Us Band – Shine VOL 2 Album Mp3 Zip
Download Piano Project – Movie Songs on Piano Album Mp3 Zip
Download The Learning Station – Physical Ed Album Mp3 Zip
Download Soneros de FE – Tumbao y Sabor Edición especial Album Mp3 Zip
Download CloudNone – Wish – EP Album Mp3 Zip
Download Dies Holocaustum – Scorched Promised Land Album Mp3 Zip
Download Dirt Farmer – Satellites Album Mp3 Zip
Download 7krat3 – I – Ep Album Mp3 Zip
Download Esly Ranieri – La luce nel cuore – EP Album Mp3 Zip
Download DOHM – Unstoppable Fate Album Mp3 Zip
Download אהוד בנאי – הולך ומתקרב Album Mp3 Zip
Download Rob Disner – For All Mankind Album Mp3 Zip
Download Perry “Blocker” Sand – The Essential: Perry Blocker Sand Album Mp3 Zip
Download DNYDK – Lovers Eyes – EP Album Mp3 Zip
Download ThePat – Air Album Mp3 Zip
Download Bass Boosted HD – Bass Boosted Music Extreme Album Mp3 Zip
Download Josephine Birch – Colour Shadow Light Album Mp3 Zip
Download Mind Dimension – Live – EP Album Mp3 Zip
Download blackbear, Cesar MC & Mc Pedrinho – Corvete Album Mp3 Zip
Download Benoit B – Notes of Love – EP Album Mp3 Zip
Download The BO – Strane forme di umanità Album Mp3 Zip
Download Various Artists – Super Techno Fruhstuck 26 Album Mp3 Zip